PROJECTS .

Railway Arch Bridge over Almonte River.

  • 143
  • 143
  • 143
  • 143
  • 143
  • 143
  • 143
  • 143
  • 143
CLIENT:
YEAR:
2013
Railway Arch Bridge over Almonte River. .

Project for a 384 m free span railway arch bridge.
Client UTE AVE ALcantara-Garrovillas (FCC Construction-Conduril)
Year 2013.
4 Teams for completion of the 4 initial arch sections and the closing segments.